The electric lighting system existing in the shopping and service complex is outdated, there is a danger of an emergency. A new lighting plan was required with modern equipment and design accents. Completed the project indoors and outdoors in 12 days.
Stages of work
- Dismantling of the old electric lighting system. Unfortunately, the illiterate arrangement of wires and energy carriers forced our builders to spoil 4 walls of the complex. Dismantling took place in the evening, so as not to interfere with the work of the complex during the day.
- Drawing up a new lighting plan. The drawings were ready 8 days after the start of work. Such a large complex required a careful approach to the location of the equipment. The lighting of the surrounding area had to be simple, so there were no problems with it.
- System installation. The new arrangement of wiring and electrical panels did not harm the walls and, at the same time, was invisible to the average person. Our designers have done spot lighting in the complex in accordance with the plan and created flood lighting in the main hall.
- Outdoor Lighting. It took us only 1 day for it. Lanterns along the perimeter of the complex perfectly illuminate the territory and are in harmony with the style of the complex. Load tests passed successfully.
Result
Modern and safe electric lighting system with a design approach. LED floor lamps reduce energy costs. Remote control of lighting in the hall allows you to select a mode without leaving the office. An additional emergency lighting system was also installed with illumination of exits and evacuation plans.