They came to help in the construction of the Afrina residential complex. With the help of our own fleet of special equipment, we laid the foundation, erected a frame, completed brick cladding and finishing of buildings. After that, they set about arranging the courtyard area and completed the construction on time.
Prerequisites
For the prompt construction of a residential complex, a huge list of special equipment is required for the implementation of all types of work at the facility. The Allcorp3 company, having the largest fleet of special equipment in Moscow, immediately came to the rescue: 11 truck cranes, 7 dump trucks, 3 excavators and 12 manipulators were required to complete the construction on time. Rest assured, we have coped with even such a difficult task.
Work progress
- Laying the foundation. Excavation excavation and loading of concrete slabs.
- Erection of a monolithic concrete frame. Lifting slabs with manipulators and truck cranes.
- Brick cladding. Cargo transportation of bricks and cement.
- Internal and external finishing of buildings.
- Arrangement of the yard area. Unloading rubble and installing playgrounds.
Result
5000 apartments for six months of work. Five 16-storey houses with high-quality interior and exterior decoration for a comfortable stay, as well as a cozy courtyard area for walking and playing for children.